levo logoMade with Levo

Fast Curing Compounds for Concrete

Use Odus Fast Cure to reduce concrete curing period from 28 days to just 7 Days!

img2

Cure Concrete in 7 Days

Odus Fast cure accelerates the concrete curing time and helps to achieve 28 day strength faster than ever

Odus Fast Cure

Mix with concrete and achieve the required strength faster

image mobile

Our Clients

Hershey's
L&T Construction
LG
P&G
Yanjan
Eicher
Reliance
Icon

How It Works?

Odus Fast Cure accelerates the concrete strengthening process so that in just 7 days the required strength is achieved.

image1

Easy 3-Step Application

logo

Step 1: Mix in Concrete

Mix Part 1 and 2 in concrete as per the recommended ratio

logo

Step 2: Lay and Level

Use normal concrete laying and levelling process

logo

Step 3: Spray Part 3

After 24 hours of levelling, spray part 3 on the floor

Fast Curing Solution for Diverse Industries in all Industrial Areas

image

Manufacturing Companies

image

Warehouses

image

Big Box Stores

image

Public Spaces

image

Hospitals

image

Educational Institutes

Trusted by Smart Engineers

image1

India's Best Industrial and Commercial Flooring Solution Provider

Trusted by 200+ clients. We provide flooring services and supply products for all sorts of Industrial flooring. Call us at +917869964996 or share contact details by filling the form below:

Frequently Asked Questions

How much is normal curing time for concrete?

How much will be the curing time after using the Fast Cure kit?

Does Fast cure negatively affect concrete strength?

Is there a minimum concrete grade to use Fast Cure?

How much does Fast Cure cost?